Français |
Anglais |
à la demande (production) |
make to order / on request (production) |
accumulation / retard |
backlog |
actif / passif |
asset / liability |
actions correctives et préventives |
corrective (recovery) / preventive actions |
amélioration continue |
continuous improvement |
amont |
upstream |
analyse des causes racines |
root cause analysis |
arrêt / interruption |
stoppage |
atelier |
shop floor / workshop |
attentes du client |
customer expectations |
audit de maturité de la supply chain |
supply chain process management maturity |
augmenter/diminuer les capacités |
increase/decrease the capacities |
automaintenance |
autonomous maintenance |
aval |
downstream |
avance (en) |
advance (in) |
besoins du client |
customer needs |
calcul de besoin net (CBN) |
material requirement planning (MRP) |
calcul des charges détaillées (CCD) |
capacity requirement planning (CRP) |
calendrier / programme |
schedule |
capacité |
capacity / capability |
capacité supplémentaire/de secours
(heures supp, interim, …) |
surge capacity |
cause racine |
root cause |
cellule ou îlot de production |
production cell |
chaîne d'approvisionnement / chaîne logistique globale |
supply chain |
changement de série |
change of die |
changement de série |
changeover (setup) |
chaque pièce chaque (jour) = CPC |
every part every (day) = EPE |
charge |
workload |
commande en attente |
back order |
compétence |
skill |
compétent, expérimenté |
proficient |
compromis |
tradeoff |
consommation |
use / consumption |
courbe d'apprentissage |
learning curve |
courbe d'apprentissage (Wright) |
learning curve |
coûts de stockage |
storage costs |
coûts d'exploitation |
operating expenses |
current-state map (VSM) |
cartographie actuelle |
déballer / emballer |
unpack / pack |
débit / produit des ventes |
throughput |
déclencher un réapprovisionnement |
trigger a replenishment |
défaut |
defect |
délai |
deadline / period of time |
dépôt de stockage |
supermaket |
dépôt de stockage de produits finis |
finished goods market |
détecter un écart |
detect a deviation |
diagnostic / audit |
diagnosis / audit |
disponibilité |
availability |
disposition/implantation |
layout |
durée |
time / period of time |
écart |
discrepency |
échéance client |
customer due date |
efficace |
effective |
efficience |
efficiency |
en-cours |
work in progress (WIP) |
entrepôt |
warehouse |
équilibrer le flux |
balance the flow |
équipe (quart de travail) |
shift |
fabrique |
factory |
file d'attente |
queue |
flux continu |
continuous flow
single (one) piece flow |
flux lissé |
smooth / leveled flow |
flux poussé |
push system |
flux tiré |
pull system |
fournir / distribuer |
supply |
fournisseur |
supplier |
frais généraux |
overhead cost |
fréquence des livraisons |
frequency of shipment |
future state map (VSM) |
cartographie future |
gamme de produits |
product mix |
gaspillage |
waste |
gestion charge - capacité |
workload and capacity management |
gestion de la performance de la chaîne logistique |
supply chain performance management (SPM) |
goulot |
bottleneck |
indicateur physique de performance (IPP) |
key performance indicator (KPI) |
indicateurs / mesures |
metrics |
interdépendance et variabilité |
dependancy and variability |
juste nécessaire / juste à temps |
just in time |
kanban de production |
production kanban |
kanban de retrait |
withdrawal kanban |
kanban de signalisation |
signal kanban |
la fiabilité |
the reliability |
la réactivité |
the responsiveness |
la taille de lot économique |
economic batch size |
les meilleures pratiques |
the best practices |
libre-service (LIBS) |
point of use storage (POUS) |
livraison |
delevery |
livraison urgente |
expedited delivery |
lot |
batch |
magasin |
market |
magasin de pièces |
purchased parts market |
main d'œuvre |
workforce |
maintenir/améliorer la performance |
sustain/improve performance |
manquant |
missing part |
manque / pénurie |
shortage |
manutention |
handling |
matières premières |
raw materials |
méthode de résolution de problème |
problem solving method |
mettre en place un flux tiré |
implement a pull system |
micro-arrets |
minor stops |
Modèle SCOR (supply chain operations reference) |
SCOR model management processes: plan, source, make, deliver, return |
niveler |
level |
nomenclature (produit) |
bill of material |
non-conformité client |
quality escape |
ordonnancement |
scheduling |
panne |
breakdown / failure / outage |
panne |
equipment failure |
pause |
scheduled break |
perte de qualité |
quality loss |
perte de vitesse |
speed loss |
pertes & profits |
P&L (profit & loss) - business plan |
pièce détachée |
spare part |
pilotage de la performance |
performance management |
plan de progrès |
progress plan |
plan directeur de production (PDP) |
master production schedule (MSP) |
plan d'urgence |
contingency plan |
plan industriel et commercial (PIC) |
sales & operations plan (S&OP) |
planification |
planning |
point de commande |
reorder point |
poste de travail |
workplace / station |
premier entré premier sorti (PEPS) |
firts in firts out (FIFO) |
prendre du retard |
fall behind schedule |
préparation de commande |
picking |
problème |
issue |
processus |
process |
processus de fabrication |
manufacturing process |
processus régulateur |
pacemaker |
production stable |
steady output |
production sur stock |
"make to stock" production |
produire par quart de 8 heures |
run for 8 hours shift |
profondeur de retard |
delay value (DV) / depth of delay (DOD) |
quai de déchargement / recette |
receiving dock |
quai de départ / expedition |
shipping / loading dock |
quart de travail |
shift |
quotidiennement |
on a daily basis |
rationaliser / simplifier |
streamline |
réapprovisionnement |
replenishment |
rebuts |
scraps / rejects / defects |
rechercher des fournisseurs |
to source suppliers |
reclamation client |
claim |
réductions de coûts |
cost savings |
réduire le temps de traversée |
to shorten lead time |
réglages |
setup and adjustments |
régler un problème |
fix a problem |
ressource disponible |
idle resource |
ressource occupée |
busy resource |
retard |
delay |
retouche |
rework |
revue de première article (1ère production série) |
first article inspection |
rupture de stock |
inventory shortage (breaking) |
rythme de la demande client |
takt time |
satisfaire la demande client |
to satisfy the customer demande |
se remettre d'événements non désirés |
to recover from undesired events |
site |
facility |
stabiliser un processus |
stabilize a process |
stock |
inventory |
stock de sécurité / tampon |
safety / buffer stock |
supprimer les gaspillages |
eliminate the wastes |
sur étagère |
on the shelf |
système de pilotage de la production |
production planning/control system |
taille de lot |
batch size |
tampon / marge |
buffer |
taux de profit du capital |
return on investment |
taux de panne |
failure rate |
taux de production "bon du premier coup" / "premier passage" |
first time yield (FTY) |
taux de qualité |
on quality delivery (OQD) |
taux de rendement global (TRG) |
total effective equipment performance (TEEP) |
taux de rendement synthétique (TRS) = qualité x performance x disponibilité |
overall equipment effectiveness (OEE) = quality x performance x availability |
taux de rotation des stocks |
inventory turns / inventory turnover |
taux de service |
on time delivery (OTD) |
temps d'arrêt / d'indisponibilité |
downtime |
temps de cycle |
cycle time |
temps de fonctionnement |
operating time |
temps de fonctionnement (arrêts subis) |
run time (availability loss) |
temps de traversée |
lead time |
temps d'ouverture |
scheduled time |
temps mort |
slack time |
temps net (micro-arrêts) |
net run time (performance loss) |
temps passé |
elapsed time |
temps requis (arrêts programmés) |
planned production time (schedule loss) |
temps total |
all time |
temps utile (pertes qualité) |
fully productive time (quality loss) |
tournée du laitier |
milk run replenishment |
travail en heures supplémentaires |
overtime |
travail standard |
standardized work |
tresorerie |
cash |
un chariot élevateur / monte-charge |
forklift |
un tableau de bord |
a scorecard |
une dérogation |
a concession |
une ligne d'assemblage |
assembly line |
une percée technologique |
a technological breakthrough |
usine |
plant |
valeur ajoutée |
value-added |
variabilité de la demande |
variability of demand |
vision centrée sur les ressources / les flux |
resources / flow centric view |